MWp/ year
Country
Capacity: 15,5 kWp
The project: Hoang Sa Hotel Add: 54-56 Duong Dinh Nghe str, Son Tra district, Danang city System capacity: 15,5 kWp Grid-connected Solution Solar System Operation Center: SSOC Implementation period: 10 days Finished 6/2017
Capacity: 117,8kWp
Capacity: 18.24 kWp
Capacity: 10 kWp
Capacity: 4.16 Wp
Capacity: 28.52 kWp
Capacity: 55 kWp
Capacity: 10 kWp
Capacity: 7 kWp
Capacity: 50 kWp
Capacity: 63,96 kWp
Capacity: 3 kWp
Capacity: 110 kWp